Lichtensee, Germany

Agraferm

Plant nameLichtensee
Start up2012
CountryGermany
Type of Waste Energy Crops
Capacity 65.000
Final ClientDanpower Gruppe, Potsdam

 

Flexible operation with both gas to grid and electrical power generation

In this biomethane plant built by Agraferm for the Danpower Group, 1,400 Nm³ of raw biogas is turned into 700 Nm³ of biomethane every hour, i.e. it is brought up to natural gas quality using a physical pressure washing process and then fed into the natural gas grid operated by the local gas distributor ENSO Netz GmbH. A further 600 Nm³/h powers the local 1.2 MWel CHP-unit, which also is used to provide electrical power flexibly at peak demand hours.

The plant is characterised by the efficient use of a technology, which allows for a higher dry matter organic loading rate and at the same time a smaller fermenter and a reduction in energy consumption. With just 2 fermenters and 1 secondary fermenter the plant produces an output of around 4 MWel.

This type of technology is particularly interesting for locations with a limited amount of available space. Furthermore it was developed to deal with a very high level of viscosity without having tocompromise on safety, flexibility or even gas output. This allows the operator the option of using a very varied and opportunistic substrate mix.